“Administrative Approval”?
Looks like my first reactions to the new agenda for the Downtown Design Review Committee match those being asked at OKC Talk. Exactly how is it that city staff can administratively approve replacing brick, as originally voted by the Downtown Design Review Committee, with EIFS Stucco? And what’s up with the windows?
6. DTCA-11-00092, at 250 N Robinson Ave (DBD), by Pierre Derenoncourt for Midland Center LP for revision to original Certificate of Approval to install EIFS in place of originally approved brick veneer on upper levels of the east elevation; and modify the proposed work to reflect only floors 13 to 18 at east elevation.
7. DTCA-11-00092, at 250 N Robinson Ave (DBD), by Pierre Derenoncourt for Midland Center LP, for second revision to original Certificate of Approval to delete previously approved window systems in upper levels of east elevation; install metal panel systems in lieu of windows in same configuration and location at rear elevation.
In other business, as expected by critics of the Civic Center park redesign, the Planning Department is now recommending approval…
Thank you for joining our conversation on OKC Central. We encourage your discussion but ask that you stay within the bounds of our commenting and posting policy.
Comments
IMHO, Couch needed to be let go years ago…way back when he was project manager of MAPS and it came in costing 47.75% more than what voters were told. Then he hires/promotes Mr. Wenger to oversee MAPS 3 citing his oversight of a couple of MAPS projects stating that they came in on time and on budget. neither were the case.




this is for the Dowell Center correct?
if so this IMHO is a big overreact by city staff.